• Normal colour scheme
  • Dyslexia colour scheme
  • High visual colour scheme

Featured:

Work on the Olympic Park has reached the 'demolish, dig, design' stage of development.

By Beijing 2008 the Park will be ready for the big build as the venues and landscape take shape.

Soil Remediation Plinth

Preparing the ground

Find out about the work underway to prepare the Park for construction.

Computer generated image of people walking alongside the river in the Olympic Park as it may look after The Games

After the Games

All the venues and plans have been designed with long-term use in mind.

Boy breakdancing

Cultural plans

In autumn 2008 the UK will come alive as a four-year cultural festival inspired by 2012.

Read about plans for the Cultural Olympiad and Games-time ceremonies, and watch our exclusive videos with leading cultural figures.

Work has begun at Stratford Regional Station

Transport improvements

A £100m upgrade is trebling the capacity of Stratford Regional Station.

The improvements will allow thousands of spectators to pass through the station during the Games and help the station cater for increased passenger demand in the future.

People collecting tyres from the river

A sustainable Games

Sustainability has been built into every aspect of London 2012's plans - from recycling construction materials to inspiring a healthy lifestyle.

Read about plans to ensure that London will be the greenest, most environmentally sustainable Games.