• Normal colour scheme
  • Dyslexia colour scheme
  • High visual colour scheme

James, Olympic Park worker

James works on the Olympic Park site.

Soil washing on the Olympic Park

James, Olympic Park worker, 24 July 2008

I work on the north of the Olympic Park and our team runs two soil washing machines. The machines are helping to clean up contaminated soil (mostly from the previous industrial use of the area) so that it can reused in the creation of the Park.

Across the site, soil has been tested for a range of contamination, which consists mostly of hydrocarbons such as petrol and oil. Samples of contaminated soil are tested in an on-site lab to measure the levels of contamination and to establish the appropriate treatment. The soil is then sent to our 'Soil Treatment Centre (STC)'.

Soil washing on the Olympic Park:

soilwashing1

Read more of “Soil washing on the Olympic Park”

November 2008
SMTWTFS
1
2345678
9101112131415
16171819202122
23242526272829
30

October 2008